Things tagged 'bollards'

limited to the area of City Cycling Edinburgh:

3 issues found for 'bollards':

  • Bollards on Newbridge bridge.

    Created by FrenchyF // 1 thread

    The bollards at the bottom of the ramps on either side of the bridge over the M9 are too narrow. This means that cyclists coming onto the ramps need to stop to manoeuvre around them, which makes it difficult to get going again.

    It also makes it very difficult, or even impossible, for people with tandems, cargo bikes, wheelchairs etc. to use the bridge.

    Please sign in to vote.
  • Gap between bollards too narrow; missing dropped kerb

    Created by FrenchyF // 1 thread

    There are two lines of bollards on this path, which are set quite close together, preventing easy access for disabled people, cyclists with trailers etc.

    Also, at the top of the path, there is no dropped kerb, making it difficult to return to the carriageway at Cook Crescent.

    Please sign in to vote.
  • Gap between bollards too narrow

    Created by FrenchyF // 0 threads

    The gap between the bollards is too narrow, as it forces cyclists to dismount to pass, even if they don't have a trailer. Ellen's Glen Loan is, as far as I know, the only paved route between Gilmerton and Liberton which avoids the main roads, and this path is the only paved way to reach it from Gilmerton.

    Please sign in to vote.

13 threads found for 'bollards':

No library items found for 'bollards'.

No planning applications found for 'bollards'.

Back to top